Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · NGET

West Weybridge

West Weybridge is a 57 MW battery storage project consented, connecting to the National Grid (England & Wales) network at West Weybridge 275kV Substation, with capacity due from September 2028. The connection agreement is held by El (West Weybridge) Limited.

Project stageConsented
  1. Planning (completed)
  2. Consented (current stage)
  3. Construction (not yet reached)
  4. OperatingFrom Sep 2028 (not yet reached)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-004324
Customer
El (West Weybridge) Limited
Technology
Energy Storage System
Total capacity
57 MW
Change in this agreement
+57 MW
Capacity effective from
30 September 2028
Connection site
West Weybridge 275kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Consents Approved
Connections reform gate
Gate 2

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near West Weybridge · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem