Grid infrastructure β€Ί Connection queue β€Ί Solar

SOLAR Β· NGET

Hall Ings Farm Substation

Hall Ings Farm Substation is a 100 MW solar project in planning, connecting to the National Grid (England & Wales) network at Creyke Beck 132kV, with capacity due from October 2034. The connection agreement is held by O&G Group Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2034 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-004275
Customer
O&G Group Limited
Technology
PV Array (Photo Voltaic/solar)
Total capacity
100 MW
Change in this agreement
+100 MW
Capacity effective from
30 October 2034
Connection site
Creyke Beck 132kV
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Scoping

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Creyke Beck Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem