Grid infrastructure › Connection queue › Battery storage
BATTERY STORAGE · SPTKINKHALL266MW BESS BEGA (Kinkell)
KINKHALL266MW BESS BEGA (Kinkell) is a 266 MW battery storage project in planning, connecting to the SP Transmission (south Scotland) network at Kinkell IDNO GSP, with capacity due from April 2031. The connection agreement is held by Care Power (Kinkhall) Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Apr 2031 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-004268
- Customer
- Care Power (Kinkhall) Limited
- Technology
- Energy Storage System
- Total capacity
- 266 MW
- Change in this agreement
- +266 MW
- Capacity effective from
- 30 April 2031
- Connection site
- Kinkell IDNO GSP
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Scoping
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem