🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · SPT

TH Renfrewshire

TH Renfrewshire is a 250 MW battery storage project in planning, connecting to the SP Transmission (south Scotland) network at TH Renfrwshire 275kV Substation, with capacity due from October 2033. The connection agreement is held by FRV Powertek Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2033 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-004188
Customer
FRV Powertek Limited
Technology
Energy Storage System
Total capacity
250 MW
Change in this agreement
+250 MW
Capacity effective from
31 October 2033
Connection site
TH Renfrwshire 275kV Substation
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The connection site could not be placed on the map.

Projects connecting near TH Renfrwshire · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem