Grid infrastructure › Connection queue › Solar + storage

SOLAR + STORAGE · NGET

Project Invicta

Project Invicta is a 350 MW solar + storage project in planning, connecting to the National Grid (England & Wales) network at East Kent Connection Node B 400kV Substation, with capacity due from October 2036. The connection agreement is held by Project Invicta Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2036 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-004133
Customer
Project Invicta Limited
Technology
Energy Storage System, PV Array (Photo Voltaic/solar), Wind Onshore
Total capacity
350 MW
Change in this agreement
+350 MW
Capacity effective from
31 October 2036
Connection site
East Kent Connection Node B 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

This project connects at a new substation (a “connection node”) that has not been built or located yet.

Projects connecting near East Kent Connection Node B · Grid map

Other projects at East Kent Connection Node B 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem