Grid infrastructure › Connection queue › Solar + storage
SOLAR + STORAGE · SPTLairdmannoch Energy Park
Lairdmannoch Energy Park is a 100 MW solar + storage project in planning, connecting to the SP Transmission (south Scotland) network at Lairdmannoch Energy Park 132kV substation, with capacity due from June 2030. The connection agreement is held by Lairdmannoch Energy Park Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Jun 2030 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-003781
- Customer
- Lairdmannoch Energy Park Limited
- Technology
- Energy Storage System, PV Array (Photo Voltaic/solar), Wind Onshore
- Total capacity
- 100 MW
- Change in this agreement
- +100 MW
- Capacity effective from
- 28 June 2030
- Connection site
- Lairdmannoch Energy Park 132kV substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Awaiting Consents
Connection site
The connection site could not be placed on the map.
Projects connecting near Lairdmannoch Energy Park · Grid map
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem