Grid infrastructure › Connection queue › Solar + storage

SOLAR + STORAGE · SPT

Lairdmannoch Energy Park

Lairdmannoch Energy Park is a 100 MW solar + storage project in planning, connecting to the SP Transmission (south Scotland) network at Lairdmannoch Energy Park 132kV substation, with capacity due from June 2030. The connection agreement is held by Lairdmannoch Energy Park Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Jun 2030 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-003781
Customer
Lairdmannoch Energy Park Limited
Technology
Energy Storage System, PV Array (Photo Voltaic/solar), Wind Onshore
Total capacity
100 MW
Change in this agreement
+100 MW
Capacity effective from
28 June 2030
Connection site
Lairdmannoch Energy Park 132kV substation
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Awaiting Consents

Connection site

The connection site could not be placed on the map.

Projects connecting near Lairdmannoch Energy Park · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem