Natpower Basingstoke Green Energy Park

Natpower Basingstoke Green Energy Park is a 1.0 GW battery storage project in planning, connecting to the National Grid (England & Wales) network at Chiltern Connection Node B 400kV Substation, with capacity due from October 2038. The connection agreement is held by Fleet Hampshire Energy Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2038 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-003746
Customer
Fleet Hampshire Energy Limited
Technology
Energy Storage System
Total capacity
1.0 GW
Change in this agreement
+1.0 GW
Capacity effective from
31 October 2038
Connection site
Chiltern Connection Node B 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

This project connects at a new substation (a “connection node”) that has not been built or located yet.

Projects connecting near Chiltern Connection Node B · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem