Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · SPT

Kirkcaldy BESS

Kirkcaldy BESS is a 100 MW battery storage project in planning, connecting to the SP Transmission (south Scotland) network at Kirkcaldy BESS 132kV Substation, with capacity due from October 2032. The connection agreement is held by Apatura Battery Ltd.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2032 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-003743
Customer
Apatura Battery Ltd
Technology
Energy Storage System
Total capacity
100 MW
Change in this agreement
+100 MW
Capacity effective from
31 October 2032
Connection site
Kirkcaldy BESS 132kV Substation
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The marker shows the place the connection site is named after, not the project itself, with the transmission network around it.

Projects connecting near Kirkcaldy BESS · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem