Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · NGET

SAE Usk 1

SAE Usk 1 is a 349 MW battery storage project in planning, connecting to the National Grid (England & Wales) network at South Wales East Node A 275kV Substation, with capacity due from October 2037. The connection agreement is held by Afon Wysg Energy Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2037 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-003590
Customer
Afon Wysg Energy Limited
Technology
Energy Storage System
Total capacity
349 MW
Change in this agreement
+349 MW
Capacity effective from
31 October 2037
Connection site
South Wales East Node A 275kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

The connection site could not be placed on the map.

Projects connecting near South Wales East Node A · Grid map

Other projects at South Wales East Node A 275kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem