Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · SPT

Craigneuk 250MW BESS

Craigneuk 250MW BESS is a 250 MW battery storage project in planning, connecting to the SP Transmission (south Scotland) network at Craigneuk 250MW BESS 275kV Substation, with capacity due from October 2034. The connection agreement is held by Apatura Project 23 Ltd.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2034 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-003579
Customer
Apatura Project 23 Ltd
Technology
Demand, Energy Storage System
Total capacity
250 MW
Change in this agreement
+250 MW
Capacity effective from
31 October 2034
Connection site
Craigneuk 250MW BESS 275kV Substation
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

The connection site could not be placed on the map.

Projects connecting near Craigneuk · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem