Grid infrastructure › Connection queue › Solar + storage
SOLAR + STORAGE · SPTEcoKincardine
EcoKincardine is a 249 MW solar + storage project in planning, connecting to the SP Transmission (south Scotland) network at Kincardine North 400kV Substation, with capacity due from October 2030. The connection agreement is held by Econergy International Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2030 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-003557
- Customer
- Econergy International Limited
- Technology
- Energy Storage System, PV Array (Photo Voltaic/solar)
- Total capacity
- 249 MW
- Change in this agreement
- +249 MW
- Capacity effective from
- 31 October 2030
- Connection site
- Kincardine North 400kV Substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Kincardine North 400kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem