SOLAR · NGETLittle Harrowden
Little Harrowden is a 1.0 GW solar project in planning, connecting to the National Grid (England & Wales) network at West Anglia Connection Node F 400kV Substation, with capacity due from October 2034. The connection agreement is held by Little Harrowden 10 Renewables Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2034 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-003416
- Customer
- Little Harrowden 10 Renewables Limited
- Technology
- Demand, PV Array (Photo Voltaic/solar)
- Total capacity
- 1.0 GW
- Change in this agreement
- +1.0 GW
- Capacity effective from
- 31 October 2034
- Connection site
- West Anglia Connection Node F 400kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
Connection site
This project connects at a new substation (a “connection node”) that has not been built or located yet.
Projects connecting near West Anglia Connection Node F · Grid map
Other projects at West Anglia Connection Node F 400kV Substation
- Market Harborough Green Energy HubHydro and pumped storage · 1.0 GW · Scoping
- Market HarboroughSolar + storage · 700 MW · Awaiting Consents
- Noventum Market HarboroughSolar + storage · 249 MW · Scoping
- Lightsource BraybrookeSolar + storage · 240 MW · Scoping
- Nethercourt Solar & BESS FarmSolar + storage · 240 MW · Scoping
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem