Grid infrastructure › Connection queue › Solar + storage

SOLAR + STORAGE · NGET

Eaton Socon High Impact Green Energy Hub (HIGEH) 1

Eaton Socon High Impact Green Energy Hub (HIGEH) 1 is a 1.0 GW solar + storage project in planning, connecting to the National Grid (England & Wales) network at Eaton Socon 400kV Substation, with capacity due from October 2033. The connection agreement is held by Telis Energy UK Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2033 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-002656
Customer
Telis Energy UK Limited
Technology
Energy Storage System, Nuclear, PV Array (Photo Voltaic/solar), Reactive Compensation, Wind Onshore
Total capacity
1.0 GW
Change in this agreement
+1.0 GW
Capacity effective from
30 October 2033
Connection site
Eaton Socon 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Eaton Socon · Grid map

Other projects at Eaton Socon 400kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem