Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · SPT

Learielaw Energy Storage

Learielaw Energy Storage is a 100 MW battery storage project in planning, connecting to the SP Transmission (south Scotland) network at Learlielaw Energy Storage 132kV Substation, with capacity due from October 2028. The connection agreement is held by Learielaw Energy Storage Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2028 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-002531
Customer
Learielaw Energy Storage Limited
Technology
Energy Storage System
Total capacity
100 MW
Change in this agreement
+100 MW
Capacity effective from
31 October 2028
Connection site
Learlielaw Energy Storage 132kV Substation
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

The connection site could not be placed on the map.

Projects connecting near Learlielaw Energy Storage · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem