BATTERY STORAGE · SPTLearielaw Energy Storage
Learielaw Energy Storage is a 100 MW battery storage project in planning, connecting to the SP Transmission (south Scotland) network at Learlielaw Energy Storage 132kV Substation, with capacity due from October 2028. The connection agreement is held by Learielaw Energy Storage Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2028 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-002531
- Customer
- Learielaw Energy Storage Limited
- Technology
- Energy Storage System
- Total capacity
- 100 MW
- Change in this agreement
- +100 MW
- Capacity effective from
- 31 October 2028
- Connection site
- Learlielaw Energy Storage 132kV Substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
Connection site
The connection site could not be placed on the map.
Projects connecting near Learlielaw Energy Storage · Grid map
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem