Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · SPT

Braidfield Battery Storage

Braidfield Battery Storage is a 100 MW battery storage project in planning, connecting to the SP Transmission (south Scotland) network at Braidfield Battery Storage 132kV Substation, with capacity due from September 2027. The connection agreement is held by Braidfield Battery Storage Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Sep 2027 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-002357
Customer
Braidfield Battery Storage Limited
Technology
Demand, Energy Storage System
Total capacity
100 MW
Change in this agreement
+100 MW
Capacity effective from
27 September 2027
Connection site
Braidfield Battery Storage 132kV Substation
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The connection site could not be placed on the map.

Projects connecting near Braidfield Battery Storage · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem