Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · SPT

Branxton PV & BESS Station

Branxton PV & BESS Station is a 1.0 GW battery storage project in planning, connecting to the SP Transmission (south Scotland) network at Branxton 400/132kV, with capacity due from October 2028. The connection agreement is held by IGP Solar 26 Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2028 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-002122
Customer
IGP Solar 26 Limited
Technology
Energy Storage System
Total capacity
1.0 GW
Change in this agreement
+1.0 GW
Capacity effective from
31 October 2028
Connection site
Branxton 400/132kV
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Branxton · Grid map

Other projects at Branxton 400/132kV

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem