Grid infrastructure › Connection queue › Solar + storage

SOLAR + STORAGE · NGET

NorthFleet Tertiary

NorthFleet Tertiary is a 50 MW solar + storage project in planning, connecting to the National Grid (England & Wales) network at Northfleet East 400kV Substation, with capacity due from June 2028. The connection agreement is held by Cse29 Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Jun 2028 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-002038
Customer
Cse29 Limited
Technology
Energy Storage System, PV Array (Photo Voltaic/solar)
Total capacity
50 MW
Change in this agreement
+50 MW
Capacity effective from
30 June 2028
Connection site
Northfleet East 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Northfleet East · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem