Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · NGET

Zenobe Stalybridge Project

Zenobe Stalybridge Project is a 150 MW battery storage project in planning, connecting to the National Grid (England & Wales) network at Stalybridge 275kV Substation, with capacity due from September 2027. The connection agreement is held by Zenobe Stalybridge Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Sep 2027 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-001940
Customer
Zenobe Stalybridge Limited
Technology
Energy Storage System
Total capacity
150 MW
Change in this agreement
+150 MW
Capacity effective from
30 September 2027
Connection site
Stalybridge 275kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Stalybridge · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem