Grid infrastructure β€Ί Connection queue β€Ί Battery storage

BATTERY STORAGE Β· NGET

Field Farm

Field Farm is a 250 MW battery storage project in planning, connecting to the National Grid (England & Wales) network at Staythorpe 400kv, with capacity due from September 2030. The connection agreement is held by Net Zero One Ltd.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Sep 2030 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-001924
Customer
Net Zero One Ltd
Technology
Energy Storage System
Total capacity
250 MW
Change in this agreement
+250 MW
Capacity effective from
30 September 2030
Connection site
Staythorpe 400kv
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Staythorpe Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem