Grid infrastructure › Connection queue › Solar + storage
SOLAR + STORAGE · SPTWyseby Hill Energy Farm
Wyseby Hill Energy Farm is a 750 MW solar + storage project in planning, connecting to the SP Transmission (south Scotland) network at Wyseby Hill Energy Farm 400kV Substation, with capacity due from October 2031. The connection agreement is held by Wysebyhill Energy Farm Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2031 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-001884
- Customer
- Wysebyhill Energy Farm Limited
- Technology
- Energy Storage System, PV Array (Photo Voltaic/solar)
- Total capacity
- 750 MW
- Change in this agreement
- +750 MW
- Capacity effective from
- 31 October 2031
- Connection site
- Wyseby Hill Energy Farm 400kV Substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem