Wyseby Hill Energy Farm

Wyseby Hill Energy Farm is a 750 MW solar + storage project in planning, connecting to the SP Transmission (south Scotland) network at Wyseby Hill Energy Farm 400kV Substation, with capacity due from October 2031. The connection agreement is held by Wysebyhill Energy Farm Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2031 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-001884
Customer
Wysebyhill Energy Farm Limited
Technology
Energy Storage System, PV Array (Photo Voltaic/solar)
Total capacity
750 MW
Change in this agreement
+750 MW
Capacity effective from
31 October 2031
Connection site
Wyseby Hill Energy Farm 400kV Substation
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

The connection site could not be placed on the map.

Projects connecting near Wyseby Hill Energy Farm · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem