Grid infrastructure › Connection queue › Battery storage
BATTERY STORAGE · SPTFife Energy Centre
Fife Energy Centre is a 100 MW battery storage project in planning, connecting to the SP Transmission (south Scotland) network at Fife Energy Centre 132kV substation, with capacity due from October 2028. The connection agreement is held by Cambridge Power Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2028 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-001868
- Customer
- Cambridge Power Limited
- Technology
- Energy Storage System
- Total capacity
- 100 MW
- Change in this agreement
- +100 MW
- Capacity effective from
- 31 October 2028
- Connection site
- Fife Energy Centre 132kV substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem