Grid infrastructure βΊ Connection queue βΊ Battery storage
BATTERY STORAGE Β· NGETOldbury (Tertiary)
Oldbury (Tertiary) is a 50 MW battery storage project in planning, connecting to the National Grid (England & Wales) network at Oldbury 275kV Substation, with capacity due from June 2027. The connection agreement is held by Pivoted Power LLP.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Jun 2027 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-001074-1
- Customer
- Pivoted Power LLP
- Technology
- Energy Storage System
- Total capacity
- 50 MW
- Change in this agreement
- +50 MW
- Capacity effective from
- 30 June 2027
- Connection site
- Oldbury 275kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Awaiting Consents
- Connections reform gate
- Gate 1
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Oldbury 275kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem