Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · NGET

Seabank (Tertiary)

Seabank (Tertiary) is a 50 MW battery storage project in planning, connecting to the National Grid (England & Wales) network at SEABANK 400/33kV SUBSTATION, with capacity due from November 2023. The connection agreement is held by Pivoted Power LLP.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Nov 2023 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-001068
Customer
Pivoted Power LLP
Technology
Energy Storage System
Total capacity
50 MW
Change in this agreement
+50 MW
Capacity effective from
1 November 2023
Connection site
SEABANK 400/33kV SUBSTATION
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Awaiting Consents
Connections reform gate
Gate 1

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near SEABANK · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem