Grid infrastructure › Connection queue › Solar + storage
SOLAR + STORAGE · NGETThorpe Marsh 1 (Tertiary)
Thorpe Marsh 1 (Tertiary) is a 57 MW solar + storage project consented, connecting to the National Grid (England & Wales) network at Thorpe Marsh 400kV Substation, with capacity due from October 2028. The connection agreement is held by Enso Green Holdings I Limited.
Project stageConsented
- Planning (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingFrom Oct 2028 (not yet reached)
- Closed (not yet reached)
Connection details
- NESO project number
- PRO-000470
- Customer
- Enso Green Holdings I Limited
- Technology
- Energy Storage System, PV Array (Photo Voltaic/solar)
- Total capacity
- 57 MW
- Change in this agreement
- +57 MW
- Capacity effective from
- 30 October 2028
- Connection site
- Thorpe Marsh 400kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Consents Approved
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Thorpe Marsh 400kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem