Grid infrastructure › Connection queue › Onshore wind
ONSHORE WIND · SPTScoop Hill Wind Farm
Scoop Hill Wind Farm is a 500 MW onshore wind project in planning, connecting to the SP Transmission (south Scotland) network at Scoop Hill Wind Farm 132kV Substation, with capacity due from October 2027. The connection agreement is held by Community Windpower Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2027 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-000327
- Customer
- Community Windpower Limited
- Technology
- Wind Onshore
- Total capacity
- 500 MW
- Change in this agreement
- +500 MW
- Capacity effective from
- 31 October 2027
- Connection site
- Scoop Hill Wind Farm 132kV Substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Awaiting Consents
- Connections reform gate
- Gate 1
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem