Dolgarrog

Dolgarrog is a 39 MW hydro and pumped storage project built and connected, connecting to the National Grid (England & Wales) network at Pentir GSP. The connection agreement is held by RWE Generation UK Plc.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-000123
Customer
RWE Generation UK Plc
Technology
Hydro
Total capacity
39 MW
Already connected
39 MW
Connection site
Pentir GSP
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.