Grid infrastructure βΊ Connection queue βΊ Gas
GAS Β· NGETDerwent
Derwent is a 162 MW gas project built and connected, connecting to the National Grid (England & Wales) network at Willington 132kV Substation. The connection agreement is held by UK Utility Reserve Limited.
Connection details
- NESO project number
- PRO-000120
- Customer
- UK Utility Reserve Limited
- Technology
- CHP (Combined Heat and Power)
- Total capacity
- 162 MW
- Change in this agreement
- +162 MW
- Capacity effective from
- 1 April 2024
- Connection site
- Willington 132kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Built
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Willington 132kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem