Grid infrastructure β€Ί Connection queue β€Ί Gas

GAS Β· NGET

Damhead Creek

Damhead Creek is a 812 MW gas project built and connected, connecting to the National Grid (England & Wales) network at Kingsnorth GSP. The connection agreement is held by VPI Power Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-000119
Customer
VPI Power Limited
Technology
CCGT (Combined Cycle Gas Turbine)
Total capacity
812 MW
Already connected
812 MW
Connection site
Kingsnorth GSP
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Kingsnorth GSP Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem