Cwm Rheidol is a 50 MW hydro and pumped storage project built and connected, connecting to the National Grid (England & Wales) network at Cwm Rheidol. The connection agreement is held by Statkraft Energy Ltd..

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-000116
Customer
Statkraft Energy Ltd.
Technology
Hydro
Total capacity
50 MW
Already connected
50 MW
Connection site
Cwm Rheidol
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Built

Connection site

The connection site could not be placed on the map.

Projects connecting near Cwm Rheidol Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem