πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

Grid infrastructure β€Ί Connection queue β€Ί Gas

GAS Β· NGET

Seabank

Seabank is a 1.2 GW gas project built and connected, connecting to the National Grid (England & Wales) network at Seabank 400kV Substation. The connection agreement is held by Seabank Power Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-000052
Customer
Seabank Power Limited
Technology
CCGT (Combined Cycle Gas Turbine)
Total capacity
1.2 GW
Already connected
1.2 GW
Connection site
Seabank 400kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Seabank Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem