Grid infrastructure β€Ί Connection queue β€Ί Onshore wind

ONSHORE WIND Β· SHET

Bad a Cheo Wind Farm

Bad a Cheo Wind Farm is a 27 MW onshore wind project built and connected, connecting to the SSEN Transmission (north Scotland) network at Mybster 3 33kV Substation. The connection agreement is held by Rwe Renewables UK Swindon Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-000018
Customer
Rwe Renewables UK Swindon Limited
Technology
Wind Onshore
Total capacity
27 MW
Already connected
27 MW
Connection site
Mybster 3 33kV Substation
Transmission owner
SSEN Transmission (north Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Mybster Β· Grid map

Other projects at Mybster 3 33kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem