NESO TEC REGISTER Β· GREAT BRITAIN

Other projects in the connection queue on the SSEN Transmission (north Scotland) network

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown30 MW in total
In planning0scoping or awaiting consent
Consented or building1closest to connecting
Built3connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

3 projects
ProjectCapacityStageConnection siteFrom
Beatrice Sync Comp
Other Β· Tinz Programme 1 Projectco 3 Limited
0 MWBuilt Beatrice 400kV Substation
SSEN Transmission (north Scotland)
Rothienorman Sync Comp
Other Β· Rothienorman Grid Services Limited
0 MWBuilt Rothienorman 400kV Substation
SSEN Transmission (north Scotland)
Thurso South Synchronous Compensation
Other Β· Thurso Grid Services Limited
0 MWBuilt Thurso GSP
SSEN Transmission (north Scotland)

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed β€œconnection nodes” are listed but not mapped.