Other projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown4380 MW in total
In planning7scoping or awaiting consent
Consented or building15closest to connecting
Built16connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

4 projects
ProjectCapacityStageConnection siteFrom
Menter Mon Morlais Anglesey Marine Energy
Other Β· Menter MΓ΄n Morlais Limited
180 MWUnder Construction/Commissioning Penrhos GSP
National Grid (England & Wales)
Mar 2032
Menter Mon Morlais Anglesey Marine Energy
Other Β· Menter MΓ΄n Morlais Limited
100 MWUnder Construction/Commissioning Penrhos GSP
National Grid (England & Wales)
Mar 2030
Menter Mon Morlais Anglesey Marine Energy
Other Β· Menter MΓ΄n Morlais Limited
60 MWUnder Construction/Commissioning Penrhos GSP
National Grid (England & Wales)
Mar 2029
Menter Mon Morlais Anglesey Marine Energy
Other Β· Menter MΓ΄n Morlais Limited
40 MWUnder Construction/Commissioning Penrhos GSP
National Grid (England & Wales)
Mar 2028

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed β€œconnection nodes” are listed but not mapped.