NESO TEC REGISTER · GREAT BRITAIN

Grid connection projects in the connection queue on the SSEN Transmission (north Scotland) network

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown30385.5 GW in total
In planning303scoping or awaiting consent
Consented or building52closest to connecting
Built89connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

303 projects · page 7 of 7
ProjectCapacityStageConnection siteFrom
Costa Head
Onshore wind · Costa Head Wind Farm Limited
16 MWScoping Finstown GSP
SSEN Transmission (north Scotland)
Apr 2029
Stoneyfield
Onshore wind · Wind 2 Limited
15 MWScoping Rothienorman GSP
SSEN Transmission (north Scotland)
Sep 2030
Scatsta1 Greener Grid Park
Battery storage · Statkraft Hydrogen UK Holding Limited
5 MWScoping Scatsta 132kV Substation
SSEN Transmission (north Scotland)
Oct 2028
Page 7 of 7

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.