GENERATION · NETWORKS · ELECTRICITY DEMAND

All energy projects

Explore operating assets, construction and proposals across the electricity system. Find the capacity, planning status and evidence behind each project.

5,951Matching project records
0Operating records
0Construction or enabling works
July 2026Official renewable register edition
DESNZ tracks projects over 150 kW, with limitations for smaller historical projects. Rows represent planning records and may include linked applications, extensions and separate storage phases. Do not sum them as a definitive national fleet total.
Reset filters

Project map

Use the map to explore the matching projects. Solid markers show published or mapped points; shaded dashed circles show approximate areas. Cable endpoints are shown separately.

Loading OpenStreetMap…

5,951 results

Understand capacity and annual energy →
Grid upgrades

Netherton / Longside EGL3 HVDC Converter

Consented
Not published

Component of a parent transmission project; no additional link capacity counted

Netherton / Longside / Peterhead, Aberdeenshire · Scotland

SSEN Transmission

A separate converter at Netherton Hub is proposed for the 2 GW EGL3 link to West Norfolk. It is distinct from the Spittal–Peterhead converter on the same hub site and from EGL2’s converter at Boddam. The hub has entered civil construction, while EGL3’s marine licence and detailed delivery stages remain separate.

Grid upgrades

Netherton / Longside Spittal–Peterhead HVDC Converter

Consented
Not published

Component of a parent transmission project; no additional link capacity counted

Netherton / Longside / Peterhead, Aberdeenshire · Scotland

SSEN Transmission

This converter is planned within Netherton Hub near Longside as the southern terminal of the 2 GW, 525 kV Spittal–Peterhead link. The cable comes ashore near Crimond at Rattray Head. Hub civil works are underway; this record does not imply the converter is installed or energised.

GRID CONTEXT

Great Britain electricity now

Explore the grid →
Loading the latest published grid interval…

National figures from the Carbon Intensity API. These do not measure an individual project’s output, cable flow or data-centre electricity use.

The wider power system

Explore conventional and nuclear power stations, grid connections, renewable technology guides and source updates.