Data centres Β· Greater London

Telehouse London Docklands Campus

Operating

Telehouse operates an established Docklands campus with a private 132 kV substation. The cited overview describes 50 MVA for that substation. This apparent-power figure must not be relabelled as IT capacity or as average consumption.

Sources reviewed 2026-10-08 Β· Telehouse

Project facts

StatusOperating
Developer / operatorTelehouse
RegionGreater London
CountryEngland
Published ratingNot published
Rating definitionCampus connection
Connection / routePrivate 132 kV substation, London Docklands
Delivery targetNot verified in this profile

Electricity demand and supply

IT capacityNot published
Grid connection capacityNot published
Apparent power reservation / substation rating50 MVA
Measured average electricity demandNot published
Published annual electricity consumptionNot published
Power usage effectiveness (PUE)Not published

Where its electricity comes from

Telehouse markets renewable electricity for Docklands. A March 2025 announcement confirms a ten-year RWE power-purchase agreement covering a substantial share of renewable procurement through 2035. The announcement does not provide a public live meter or total campus annual electricity use.

Cooling, water and backup power

Cooling and water-use figures have not been independently confirmed.

Backup capacity and fuel are not quantified in this profile.

Rated capacity is not present consumption. Renewable procurement claims describe contracts or certificates unless hourly matching and physical supply are evidenced. No live site meter is connected to this page.

Project location

Published facility or mapped building location. A location point is not a site boundary or a verified visitor entrance.

Loading OpenStreetMap…

Markers identify sites, published points or labelled connection areas. Markers are not site boundaries or entrances. EGL2’s additional outlines and route layers are explicitly identified in the developer’s map data.

Sources and review date

  1. Telehouse project information
    Reviewed 2026-10-08
  2. Telehouse–RWE renewable power-purchase agreement
    Reviewed 2026-10-08

How Octary distinguishes proposals, published ratings and live measurements

Report a correction with a source

GRID CONTEXT

Great Britain electricity now

Explore the grid β†’
Loading the latest published grid interval…

National figures from the Carbon Intensity API. These do not measure an individual project’s output, cable flow or data-centre electricity use.