Data centres Β· Greater London

Telehouse West Two, Docklands

Under construction

Telehouse broke ground in October 2025 on West Two, targeting completion in 2028. The announcement specifies 33 MW overall building capacity and two new 132 kV substations serving the wider campus. This development is separate from the existing Docklands facilities and their historical connection ratings.

Sources reviewed 2026-10-08 Β· Telehouse / KDDI

Project facts

StatusUnder construction
Developer / operatorTelehouse / KDDI
RegionGreater London
CountryEngland
Published rating33 MW
Rating definitionPublished building capacity
Connection / routeNew 132 kV substations, with 11 kV distribution across Docklands
Delivery target2028 (developer target; subject to change)

Electricity demand and supply

IT capacityNot published
Grid connection capacityNot published
Apparent power reservation / substation ratingNot published
Measured average electricity demandNot published
Published annual electricity consumptionNot published
Power usage effectiveness (PUE)Not published

Where its electricity comes from

The operator intends 100% renewable procurement. Current electricity consumption and hourly supply matching are not published.

Cooling, water and backup power

Planned air and liquid cooling, chilled-water systems and heat recovery potential. Actual WUE is not published.

HVO-fuelled backup generators are planned. Backup output, runtime and annual fuel consumption are not published.

Rated capacity is not present consumption. Renewable procurement claims describe contracts or certificates unless hourly matching and physical supply are evidenced. No live site meter is connected to this page.

Project location

The map distinguishes published or mapped site points from approximate location and connection areas. Dashed circles are context areas, not development boundaries. Follow the location sources for site plans.

Loading OpenStreetMap…

Markers identify sites, published points or labelled connection areas. Markers are not site boundaries or entrances. EGL2’s additional outlines and route layers are explicitly identified in the developer’s map data.

Sources and review date

  1. Operator construction and power specification
    Reviewed 2026-10-08

How Octary distinguishes proposals, published ratings and live measurements

Report a correction with a source

GRID CONTEXT

Great Britain electricity now

Explore the grid β†’
Loading the latest published grid interval…

National figures from the Carbon Intensity API. These do not measure an individual project’s output, cable flow or data-centre electricity use.