United States βΊ Power plants βΊ Wind farms βΊ Rhode Island
OCTARY USA Β· WIND FARMSWind farms in Rhode Island
Every US wind farm of 1 MW or more, onshore and offshore, from planning to retirement. Click a state to drill down, or search near a place.
Operating19plants
Operating capacity78.0 MWnameplate
Under construction715 MW1 plants
Whole pipeline715 MWplanned, approved and building
Map
Loading plantsβ¦
OperatingUnder constructionApprovedPlannedRetiredCancelled
Plants
20 plants
| Plant | Capacity | Stage |
|---|---|---|
| Revolution Wind | 715 MW | Under construction |
| Block Island Wind Farm | 30.0 MW | |
| NBC Field's Point Wind Farm | 4.5 MW | |
| WED Coventry 2 | 4.5 MW | |
| WED Coventry 6 | 4.5 MW | |
| Green Providence Wind II, LLC | 3.0 MW | |
| WED Green Hill, LLC | 3.0 MW | |
| WED Plainfield II, LLC | 3.0 MW | |
| WED Plainfield III, LLC | 3.0 MW | |
| WED Plainfield, LLC | 3.0 MW | |
| WED Shun I, LLC | 3.0 MW | |
| WED Shun II, LLC | 3.0 MW | |
| WED Shun III, LLC | 3.0 MW | |
| Green Providence Wind I, LLC | 1.5 MW | |
| WED Coventry 1 | 1.5 MW | |
| WED Coventry 3 | 1.5 MW | |
| WED Coventry 4 | 1.5 MW | |
| WED Coventry 5 | 1.5 MW | |
| WED NK Green | 1.5 MW | |
| WED Portsmouth One, LLC | 1.5 MW |
Operating capacity by state
Click a state to drill down; click it again to go back to the whole country.
Largest owners and operators
By capacity in the current view. Click to see their plants.
- Orsted Wind Power North America LLC1 plants Β· 715 MW
- Deepwater Wind Block Island LLC1 plants Β· 30.0 MW
- Greenbacker Renewable Energy Corporation3 plants Β· 7.5 MW
- Narragansett Bay Commission1 plants Β· 4.5 MW
- WED Coventry Two, LLC1 plants Β· 4.5 MW
- WED Plainfield III, LLC1 plants Β· 3.0 MW
- WED Shun III, LLC1 plants Β· 3.0 MW
- WED Plainfield, LLC1 plants Β· 3.0 MW
- WED Shun I, LLC1 plants Β· 3.0 MW
- Green Providence Wind II, LLC1 plants Β· 3.0 MW
- WED Green Hill, LLC1 plants Β· 3.0 MW
- WED Shun II, LLC1 plants Β· 3.0 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map Β· Individual wind turbines (USWTDB)