🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Battery storage › California

OCTARY USA · BATTERY STORAGE

Battery storage sites in California — page 8

Grid-scale battery and other energy storage in the United States, with power (MW) and, where reported, energy (MWh). Click a state to drill down, or search near a place.

Operating282plants
Operating capacity16.5 GWnameplate
Under construction4,347 MW47 plants
Whole pipeline9,936 MWplanned, approved and building

Map

Loading plants…
OperatingUnder constructionApprovedPlannedRetiredCancelled

Plants

363 plants · page 8 of 8
PlantCapacityStageStateOwner / operatorYear
Fresno Bullard High School Hybrid 0.4 MW
0 MWh
Operating CA
Fresno
Forefront Power, LLC 2020
Kama 1 LLC 0.4 MW
2 MWh
Operating CA
Mendocino
Standard Solar 2026
Kern Co Sheriff 0.4 MW
2 MWh
Operating CA
Kern
TotalEnergies Renewables USA LLC 2025
Bakersfield Driver 0.3 MW Under construction CA
Kern
Pacifico Bakersfield Driver LLC 2026
Biola University Hybrid 0.3 MW
1 MWh
Operating CA
Los Angeles
Biola University 2018
Fresno Sunnyside High School Hybrid 0.3 MW
0 MWh
Operating CA
Fresno
Forefront Power, LLC 2020
North Juvenile Detention Center Solar 0.3 MW
1 MWh
Operating CA
Tulare
SoCore Energy LLC 2019
Palm Springs DAC PV 0.3 MW
1 MWh
Operating CA
Riverside
Palm Springs USD 2023
Palmdale Water District 6MG Tank 0.3 MW Under construction CA
Los Angeles
East Avenue South Solar Project 2022, LLC 2026
Fresno Hoover High School Hybrid 0.2 MW
0 MWh
Operating CA
Fresno
Forefront Power, LLC 2020
GreenStruxure BBU004, LLC 0.2 MW
0 MWh
Operating CA
Los Angeles
ClearGen LLC 2023
GreenStruxure REP009, LLC 0.2 MW
0 MWh
Operating CA
Los Angeles
ClearGen LLC 2023
Pivot Energy PPA 29 LLC 0.1 MW Under construction CA
Placer
Pivot Energy 2027
Page 8 of 8

Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map