United States › Power plants › Battery storage › California
OCTARY USA · BATTERY STORAGEBattery storage sites in California — page 8
Grid-scale battery and other energy storage in the United States, with power (MW) and, where reported, energy (MWh). Click a state to drill down, or search near a place.
Operating282plants
Operating capacity16.5 GWnameplate
Under construction4,347 MW47 plants
Whole pipeline9,936 MWplanned, approved and building
Map
Loading plants…
OperatingUnder constructionApprovedPlannedRetiredCancelled
Plants
363 plants · page 8 of 8
| Plant | Capacity | Stage |
|---|---|---|
| Fresno Bullard High School Hybrid | 0.4 MW 0 MWh |
|
| Kama 1 LLC | 0.4 MW 2 MWh |
|
| Kern Co Sheriff | 0.4 MW 2 MWh |
|
| Bakersfield Driver | 0.3 MW | Under construction |
| Biola University Hybrid | 0.3 MW 1 MWh |
|
| Fresno Sunnyside High School Hybrid | 0.3 MW 0 MWh |
|
| North Juvenile Detention Center Solar | 0.3 MW 1 MWh |
|
| Palm Springs DAC PV | 0.3 MW 1 MWh |
|
| Palmdale Water District 6MG Tank | 0.3 MW | Under construction |
| Fresno Hoover High School Hybrid | 0.2 MW 0 MWh |
|
| GreenStruxure BBU004, LLC | 0.2 MW 0 MWh |
|
| GreenStruxure REP009, LLC | 0.2 MW 0 MWh |
|
| Pivot Energy PPA 29 LLC | 0.1 MW | Under construction |
Page 8 of 8
← Previous
Operating capacity by state
Click a state to drill down; click it again to go back to the whole country.
Largest owners and operators
By capacity in the current view. Click to see their plants.
- IPX Power USA, LLC9 plants · 2,327 MW
- Terra-Gen Operating Co-Hybrid10 plants · 860 MW
- Nova Power, LLC1 plants · 680 MW
- AES Clean Energy8 plants · 644 MW
- Vesper Energy Development LLC5 plants · 640 MW
- Terra-Gen Operating Co-BESS 28 plants · 600 MW
- Southern California Edison Co9 plants · 586 MW
- 50LW 8me LLC1 plants · 500 MW
- 26SB 8me LLC1 plants · 500 MW
- Grace Orchard Interconnection, LLC1 plants · 500 MW
- Dynegy -Moss Landing LLC1 plants · 450 MW
- Terra-Gen Operating Co-BESS4 plants · 416 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map