United States › Power plants › Battery storage › Texas
OCTARY USA · BATTERY STORAGEOperating battery storage sites in Texas — page 4
Grid-scale battery and other energy storage in the United States, with power (MW) and, where reported, energy (MWh). Click a state to drill down, or search near a place.
Operating263plants
Operating capacity19.3 GWnameplate
Under construction8,350 MW60 plants
Whole pipeline25.3 GWplanned, approved and building
Map
Loading plants…
OperatingUnder constructionApprovedPlannedRetiredCancelled
Plants
263 plants · page 4 of 6
| Plant | Capacity | Stage |
|---|---|---|
| Commerce ESS | 10.0 MW 10 MWh |
|
| Crockett BESS | 10.0 MW 25 MWh |
|
| I-Eye ESS | 10.0 MW 20 MWh |
|
| Liggett Switch | 10.0 MW 12 MWh |
|
| Matta Power Station | 10.0 MW 23 MWh |
|
| SME Mission II BESS | 10.0 MW 10 MWh |
|
| SMT Alamo LLC | 10.0 MW 10 MWh |
|
| SMT Bay City LLC | 10.0 MW 10 MWh |
|
| SMT Dallas BESS | 10.0 MW 10 MWh |
|
| SMT Dallas III BESS | 10.0 MW 10 MWh |
|
| SMT Elsa LLC | 10.0 MW 10 MWh |
|
| SMT Harlingen II LLC | 10.0 MW 10 MWh |
|
| SMT Los Fresnos LLC | 10.0 MW 10 MWh |
|
| SMT Mercedes LLC | 10.0 MW 10 MWh |
|
| SMT Mission LLC | 10.0 MW 10 MWh |
|
| SMT Rio Grande I LLC | 10.0 MW 10 MWh |
|
| SMT Rio Grande II LLC | 10.0 MW 10 MWh |
|
| SMT Santa Rosa LLC | 10.0 MW 10 MWh |
|
| Snyder BESS | 10.0 MW 20 MWh |
|
| Sweetwater BESS | 10.0 MW 20 MWh |
|
| Telview ESS | 10.0 MW 20 MWh |
|
| Westover BESS | 10.0 MW 20 MWh |
|
| Alvin | 9.9 MW 10 MWh |
|
| Angleton | 9.9 MW 10 MWh |
|
| Bexar Corrilla BESS | 9.9 MW 10 MWh |
|
| Brazoria | 9.9 MW 10 MWh |
|
| Buda BESS | 9.9 MW 25 MWh |
|
| Castle Gap Solar Hybrid | 9.9 MW 42 MWh |
|
| Caterina | 9.9 MW 10 MWh |
|
| Cedarville (TX) | 9.9 MW 10 MWh |
|
| CISCO BESS | 9.9 MW 10 MWh |
|
| Citrus City BESS | 9.9 MW 25 MWh |
|
| Cotulla BESS 1 | 9.9 MW 25 MWh |
|
| County Road BESS | 9.9 MW 25 MWh |
|
| Coyote Springs (TX) | 9.9 MW 10 MWh |
|
| DGS Five Points | 9.9 MW 20 MWh |
|
| Diboll BESS | 9.9 MW 10 MWh |
|
| Dickinson | 9.9 MW 10 MWh |
|
| Elm Street BESS | 9.9 MW 25 MWh |
|
| Falfurrias BESS | 9.9 MW 10 MWh |
|
| Farmersville (TX) | 9.9 MW 10 MWh |
|
| Farmersville West | 9.9 MW 25 MWh |
|
| Faulkner | 9.9 MW 10 MWh |
|
| Flower Valley I | 9.9 MW 20 MWh |
|
| Garden City East BESS | 9.9 MW 10 MWh |
|
| Gomez | 9.9 MW 10 MWh |
|
| Hamilton BESS | 9.9 MW 10 MWh |
|
| Heights | 9.9 MW 10 MWh |
|
| Highway 6 BESS | 9.9 MW 25 MWh |
|
| Holcomb (TX) | 9.9 MW 10 MWh |
Page 4 of 6
← Previous Next →
Operating capacity by state
Click a state to drill down; click it again to go back to the whole country.
Largest owners and operators
By capacity in the current view. Click to see their plants.
- Engie North America25 plants · 1,954 MW
- RWE Americas, LLC7 plants · 803 MW
- Key Capture Energy11 plants · 580 MW
- Lydian Energy3 plants · 550 MW
- IPX Power USA, LLC3 plants · 480 MW
- ESTX-PLD-HOUSTON2, LLC1 plants · 409 MW
- Geronimo Power3 plants · 405 MW
- Platinum Energy Storage LLC1 plants · 348 MW
- Cypress Creek Renewables3 plants · 340 MW
- HEN Infrastructure, L.L.C.31 plants · 307 MW
- SMT Ironman BESS LLC1 plants · 304 MW
- PP Jaguar BESS LLC1 plants · 300 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map