πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Power plants β€Ί Battery storage β€Ί Texas

BATTERY STORAGE

Highway 6 BESS

Highway 6 BESS is a 9.9 MW operating battery storage site in Brazos County, Texas, operated by Hwy 6 Infra LLC. Its batteries store up to 25 MWh.

Plant statusOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingJun 2026 (current stage)
  5. Closed (not yet reached)

Open in Google MapsMore battery storage sites in Texas

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
HWY6Batteries9.9 MW
25 MWh
OperatingJun 2026

Plant details

Operator
Hwy 6 Infra LLC
Location
Brazos County, Texas
Balancing authority
ERCO
Sector
IPP Non-CHP
Capacity
Operating: 9.9 MW
First unit online
Jun 2026
EIA plant ID
69323

Location

30.4423, -96.1314

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem