United States βΊ Power plants βΊ Solar farms βΊ Texas
SOLAR FARMSLampe Solar
Lampe Solar is a 60.2 MW planned solar farm in Washington County, Texas, operated by Gransolar Texas Seven LLC.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2027 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Dec 2027.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| GRS7 | Solar Photovoltaic | 60 MW | Regulatory approvals pending |
Plant details
- Operator
- Gransolar Texas Seven LLC
- Location
- Washington County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Planned: 60.2 MW
- EIA plant ID
- 67781
Location
30.3105, -96.4789
Nearby power plants
- Highway 6 BESSBattery storage Β· 9.9 MW Β· 22.6 mi
- Central Utility Plant - Texas A&MGas power plants Β· 50.1 MW Β· 22.7 mi
- OTHERTexasA&MGas power plants Β· 9.6 MW Β· 22.9 mi
- Bryan (TX)Gas power plants Β· 22.0 MW Β· 24.1 mi
- Prost ESSBattery storage Β· 200 MW Β· 24.6 mi
- DansbyGas power plants Β· 203 MW Β· 28.4 mi
- Fayette Power ProjectCoal power plants Β· 1,690 MW Β· 31.7 mi
- Staccato BESSBattery storage Β· 201 MW Β· 31.9 mi
- Grimes County SolarSolar farms Β· 210 MW Β· 33.0 mi
- Hoyte SolarSolar farms Β· 207 MW Β· 33.4 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem