| Eland Solar & Storage Center, Phase 2 Hy |
150 MW 600 MWh |
Operating |
CA Kern |
69SV 8me LLC |
2025 |
| Overnight Solar |
150 MW |
Under construction |
CA San Bernardino |
Overnight Solar LLC |
2027 |
| Scarlet II Hybrid |
150 MW 600 MWh |
Operating |
CA Fresno |
EDPR Scarlet II LLC |
2024 |
| Vikings Energy Farm |
150 MW 600 MWh |
Operating |
CA Imperial |
Vikings Energy Farm, LLC |
2024 |
| Daggett 3 |
149 MW 5 MWh |
Operating |
CA San Bernardino |
Daggett Solar Power 3 LLC |
2023 |
| Golden Field Solar III, LLC |
147 MW 147 MWh |
Operating |
CA Kern |
Golden Fields Solar III, LLC |
2024 |
| Edwards Sanborn E1A |
144 MW 272 MWh |
Operating |
CA Kern |
Terra-Gen Operating Co-Hybrid |
2022 |
| Slate Hybrid |
140 MW 561 MWh |
Operating |
CA Kings |
MN8 Energy LLC |
2022 |
| Rosamond South II |
140 MW |
Under construction |
CA Kern |
Golden Fields Solar VI, LLC |
2027 |
| Fifth Standard Solar PV, LLC (Hybrid) |
137 MW 137 MWh |
Operating |
CA Fresno |
RWE Americas, LLC |
2023 |
| Arica Solar |
136 MW 544 MWh |
Operating |
CA Riverside |
Arica Solar, LLC |
2024 |
| Edwards Sanborn E1B |
136 MW 136 MWh |
Operating |
CA Kern |
Terra-Gen Operating Co-Hybrid |
2023 |
| Chestnut |
135 MW 540 MWh |
Operating |
CA Kings |
Chestnut Westside LLC |
2023 |
| Hecate Grid Gwent Storage 1 |
135 MW |
In planning |
CA Ventura |
Hecate Grid Gwent Storage 1, LLC |
2028 |
| Arlington Energy Center II |
132 MW 528 MWh |
Operating |
CA Riverside |
Arlington Energy Center II |
2022 |
| North Central Valley |
132 MW 528 MWh |
Operating |
CA San Joaquin |
North Central Valley Energy Storage, LLC |
2023 |
| CED West Side Canal Battery Storage |
131 MW 524 MWh |
Operating |
CA Imperial |
San Diego Gas & Electric Co |
2023 |
| Daggett 2 |
131 MW 5 MWh |
Operating |
CA San Bernardino |
Daggett Solar Power 2 LLC |
2023 |
| Lancaster Area Battery |
127 MW 508 MWh |
Operating |
CA Los Angeles |
AES Distributed Energy |
2022 |
| AVEP BESS |
126 MW 504 MWh |
Operating |
CA Kern |
Leeward Asset Management, LLC |
2025 |
| LeConte Energy Storage |
125 MW 250 MWh |
Operating |
CA Imperial |
LeConte Energy Storage, LLC |
2022 |
| Oberon II Solar Project |
125 MW 500 MWh |
Operating |
CA Riverside |
IPX Power USA, LLC |
2023 |
| Oberon Solar Project |
125 MW 500 MWh |
Operating |
CA Riverside |
IPX Power USA, LLC |
2023 |
| Tumbleweed Energy Storage |
125 MW 500 MWh |
Operating |
CA Kern |
Tumbleweed Energy Storage, LLC |
2024 |
| Midway BESS |
125 MW |
Under construction |
CA Fresno |
Midway BESS LLC |
2027 |
| Edwards Sanborn E2 |
120 MW 250 MWh |
Operating |
CA Kern |
Terra-Gen Operating Co-Hybrid |
2022 |
| Rosamond South 1 |
117 MW 472 MWh |
Operating |
CA Kern |
Golden Fields Solar IV, LLC |
2025 |
| Beaumont BESS |
117 MW 400 MWh |
Operating |
CA Riverside |
Terra-Gen Operating Co-BESS 2 |
2024 |
| Blythe Solar II, LLC |
115 MW 539 MWh |
Operating |
CA Riverside |
Blythe Solar II, LLC |
2021 |
| Blythe Solar III, LLC Hybrid |
115 MW 539 MWh |
Operating |
CA Riverside |
Blythe Solar III, LLC |
2021 |
| Daggett 1 |
114 MW 454 MWh |
Operating |
CA San Bernardino |
Daggett Solar Power 1 LLC |
2025 |
| Aratina Solar Center 2 |
113 MW |
Under construction |
CA Kern |
45MG 8me LLC |
2026 |
| Separator (Etiwanda) BESS |
113 MW 450 MWh |
Operating |
CA San Bernardino |
Southern California Edison Co |
2024 |
| Blythe Mesa Solar II |
112 MW 448 MWh |
Operating |
CA Riverside |
IPX Power USA, LLC |
2022 |
| Arlington Energy Center III |
110 MW 440 MWh |
Operating |
CA Riverside |
Arlington Energy Center III |
2022 |
| Westminster Reliability Project, LLC |
110 MW |
Under construction |
CA Orange |
RWE Americas, LLC |
2026 |
| AES ES Alamitos, LLC |
100 MW 400 MWh |
Operating |
CA Los Angeles |
AES ES Alamitos, LLC |
2021 |
| Aramis I Solar Project |
100 MW 400 MWh |
Operating |
CA Alameda |
IPX Power USA, LLC |
2026 |
| Cald BESS |
100 MW 400 MWh |
Operating |
CA Los Angeles |
Cald BESS LLC |
2024 |
| Edwards Sanborn E4 |
100 MW 100 MWh |
Operating |
CA Kern |
Terra-Gen Operating Co-Hybrid |
2023 |
| Imperial Sun Solar |
100 MW |
In planning |
CA Imperial |
Imperial Sun Solar LLC |
2027 |
| Luna Storage |
100 MW 400 MWh |
Operating |
CA Los Angeles |
AES Distributed Energy |
2022 |
| Pome BESS |
100 MW 400 MWh |
Operating |
CA San Diego |
MN8 Energy LLC |
2025 |
| Sacramento Valley Energy Center, LLC |
100 MW |
Under construction |
CA Sacramento |
Sacramento Valley Energy Center, LLC |
2029 |
| Sanborn BESS 1 |
100 MW 200 MWh |
Operating |
CA Kern |
Terra-Gen Operating Co-BESS |
2021 |
| Sanborn BESS 2 |
100 MW 400 MWh |
Operating |
CA Kern |
Terra-Gen Operating Co-BESS |
2021 |
| Saticoy |
100 MW 400 MWh |
Operating |
CA Ventura |
Ventura Energy Storage, LLC |
2021 |
| Skylight Renewable Energy |
100 MW |
In planning |
CA Sutter |
Vesper Energy Development LLC |
2028 |
| Caballero |
99.7 MW 399 MWh |
Operating |
CA San Luis Obispo |
Caballero CA Storage LLC |
2025 |
| Electrolyte BESS |
99.4 MW 99 MWh |
Operating |
CA Kings |
Henrietta BESS LLC |
2025 |