OCTARY USA Β· BATTERY STORAGEEngie North America: operating battery storage sites in the USA
Grid-scale battery and other energy storage in the United States, with power (MW) and, where reported, energy (MWh). Click a state to drill down, or search near a place.
Operating27plants
Operating capacity1,989 MWnameplate
Under construction674 MW4 plants
Whole pipeline674 MWplanned, approved and building
Map
Loading plantsβ¦
OperatingUnder constructionApprovedPlannedRetiredCancelled
Plants
27 plants
| Plant | Capacity | Stage |
|---|---|---|
| Cachi | 200 MW 400 MWh |
|
| Desna | 200 MW 400 MWh |
|
| Dickens | 200 MW 200 MWh |
|
| Hydra | 200 MW 200 MWh |
|
| Paleo | 200 MW 200 MWh |
|
| Pavo | 175 MW 175 MWh |
|
| Avila | 160 MW 320 MWh |
|
| Carina | 150 MW 300 MWh |
|
| Bat Cave | 100 MW 110 MWh |
|
| North Fork TX | 100 MW 110 MWh |
|
| Antlia | 70.0 MW 140 MWh |
|
| Tortolas | 50.0 MW 50 MWh |
|
| Cascade Energy Storage, LLC | 25.0 MW 100 MWh |
|
| Pueblo BA | 19.8 MW 20 MWh |
|
| Zapata | 19.8 MW 20 MWh |
|
| Sierra Energy Storage, LLC | 10.0 MW 40 MWh |
|
| Alvin | 9.9 MW 10 MWh |
|
| Angleton | 9.9 MW 10 MWh |
|
| Brazoria | 9.9 MW 10 MWh |
|
| Dickinson | 9.9 MW 10 MWh |
|
| Heights | 9.9 MW 10 MWh |
|
| Loop 463 | 9.9 MW 10 MWh |
|
| Lopeno | 9.9 MW 10 MWh |
|
| Magnolia TX | 9.9 MW 10 MWh |
|
| Odessa | 9.9 MW 10 MWh |
|
| Ranchtown | 9.9 MW 10 MWh |
|
| Sweeny | 9.9 MW 10 MWh |
Operating capacity by state
Click a state to drill down.
Largest owners and operators
By capacity in the current view. Click to see their plants.
- Engie North America27 plants Β· 1,989 MW
- IPX Power USA, LLC8 plants Β· 1,292 MW
- RWE Americas, LLC19 plants Β· 1,242 MW
- AES Clean Energy12 plants Β· 1,187 MW
- Florida Power & Light Co13 plants Β· 1,015 MW
- Georgia Power Co5 plants Β· 773 MW
- Lydian Energy4 plants Β· 700 MW
- Nova Power, LLC1 plants Β· 680 MW
- Terra-Gen Operating Co-Hybrid9 plants Β· 650 MW
- Key Capture Energy12 plants Β· 600 MW
- Terra-Gen Operating Co-BESS 28 plants Β· 600 MW
- Copia Power2 plants Β· 567 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map