United States βΊ Power plants βΊ Battery storage βΊ Texas
OCTARY USA Β· BATTERY STORAGEEngie North America: battery storage sites in Texas
Grid-scale battery and other energy storage in the United States, with power (MW) and, where reported, energy (MWh). Click a state to drill down, or search near a place.
Operating25plants
Operating capacity1,954 MWnameplate
Under construction575 MW3 plants
Whole pipeline575 MWplanned, approved and building
Map
Loading plantsβ¦
OperatingUnder constructionApprovedPlannedRetiredCancelled
Plants
28 plants
| Plant | Capacity | Stage |
|---|---|---|
| Zeya | 250 MW | Under construction |
| Cachi | 200 MW 400 MWh |
|
| Castor | 200 MW | Under construction |
| Desna | 200 MW 400 MWh |
|
| Dickens | 200 MW 200 MWh |
|
| Hydra | 200 MW 200 MWh |
|
| Paleo | 200 MW 200 MWh |
|
| Pavo | 175 MW 175 MWh |
|
| Avila | 160 MW 320 MWh |
|
| Carina | 150 MW 300 MWh |
|
| Octans | 125 MW | Under construction |
| Bat Cave | 100 MW 110 MWh |
|
| North Fork TX | 100 MW 110 MWh |
|
| Antlia | 70.0 MW 140 MWh |
|
| Tortolas | 50.0 MW 50 MWh |
|
| Pueblo BA | 19.8 MW 20 MWh |
|
| Zapata | 19.8 MW 20 MWh |
|
| Alvin | 9.9 MW 10 MWh |
|
| Angleton | 9.9 MW 10 MWh |
|
| Brazoria | 9.9 MW 10 MWh |
|
| Dickinson | 9.9 MW 10 MWh |
|
| Heights | 9.9 MW 10 MWh |
|
| Loop 463 | 9.9 MW 10 MWh |
|
| Lopeno | 9.9 MW 10 MWh |
|
| Magnolia TX | 9.9 MW 10 MWh |
|
| Odessa | 9.9 MW 10 MWh |
|
| Ranchtown | 9.9 MW 10 MWh |
|
| Sweeny | 9.9 MW 10 MWh |
Operating capacity by state
Click a state to drill down; click it again to go back to the whole country.
Largest owners and operators
By capacity in the current view. Click to see their plants.
- Engie North America28 plants Β· 2,529 MW
- Vesper Energy Development LLC5 plants Β· 1,550 MW
- RIC Development, LLC8 plants Β· 1,351 MW
- Belltown Power Texas 2, LLC8 plants Β· 1,207 MW
- Parliament Energy Holdings LLC3 plants Β· 1,071 MW
- Intersect USA, LLC3 plants Β· 915 MW
- RWE Americas, LLC8 plants Β· 903 MW
- Lydian Energy4 plants Β· 800 MW
- Cypress Creek Renewables5 plants Β· 640 MW
- Sunraycer Assets I LLC7 plants Β· 639 MW
- Red River Clean Energy4 plants Β· 608 MW
- Clear Fork1 plants Β· 600 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map