United States βΊ Power plants βΊ Solar farms βΊ Nevada
OCTARY USA Β· SOLAR FARMSCancelled solar farms in Nevada
Every utility-scale solar farm in the United States of 1 MW or more: operating, under construction, planned, retired and cancelled. Click a state to drill down, or search near a place.
Operating70plants
Operating capacity5,480 MWnameplate
Under construction1,428 MW6 plants
Whole pipeline3,726 MWplanned, approved and building
Map
Loading plantsβ¦
OperatingUnder constructionApprovedPlannedRetiredCancelled
Plants
10 plants
| Plant | Capacity | Stage |
|---|---|---|
| Chill Sun Solar Project | 2,250 MW | Withdrawn / abandoned |
| Rough Hat 2 | 400 MW | Withdrawn / abandoned |
| Hot Pot Solar | 350 MW | Withdrawn / abandoned |
| Iron Point Solar (Hybrid) | 250 MW | Withdrawn / abandoned |
| Chuckwalla Solar, LLC | 200 MW | Withdrawn / abandoned |
| Lovelock Solar | 190 MW | Withdrawn / abandoned |
| Crescent Valley Solar | 149 MW | Withdrawn / abandoned |
| Aiya Solar Project | 100 MW | Withdrawn / abandoned |
| Snow Mountain Solar, LLC | 100 MW | Withdrawn / abandoned |
| Tesla Reno GigaFactory | 10.4 MW | Withdrawn / abandoned |
Operating capacity by state
Click a state to drill down; click it again to go back to the whole country.
Largest owners and operators
By capacity in the current view. Click to see their plants.
- Naturgy Candela DevCo LLC1 plants Β· 2,250 MW
- Nevada Power Co2 plants Β· 600 MW
- Candela Renewables, LLC1 plants Β· 400 MW
- Invenergy Services LLC2 plants Β· 339 MW
- Chuckwalla Solar, LLC1 plants Β· 200 MW
- Aiya Solar CEI, LLC1 plants Β· 100 MW
- First Solar Project Development1 plants Β· 100 MW
- Tesla Inc.1 plants Β· 10.4 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map