United States › Power plants › Solar farms › California
OCTARY USA · SOLAR FARMSSolar farms in California — page 22
Every utility-scale solar farm in the United States of 1 MW or more: operating, under construction, planned, retired and cancelled. Click a state to drill down, or search near a place.
Operating985plants
Operating capacity25.6 GWnameplate
Under construction3,756 MW56 plants
Whole pipeline7,816 MWplanned, approved and building
Map
Loading plants…
OperatingUnder constructionApprovedPlannedRetiredCancelled
Plants
1,063 plants · page 22 of 22
| Plant | Capacity | Stage |
|---|---|---|
| Sanger USD - Sanger West HS | 0.9 MW | Under construction |
| Bishop Ranch - BR 3-FF | 0.8 MW | Under construction |
| Bishop Ranch - BR 3-HH | 0.8 MW | Under construction |
| Kern Co Sheriff | 0.8 MW | |
| San Diego State University | 0.8 MW | |
| Santa Barbara ReSource Center | 0.8 MW | |
| Bishop Ranch - BR 15-AA | 0.7 MW | |
| Bishop Ranch - BR 15-CC | 0.7 MW | |
| Bishop Ranch - BR 8-Q | 0.7 MW | |
| Lara 2 Hybrid | 0.7 MW | |
| Bishop Ranch - BR 15-DD | 0.6 MW | |
| San Diego Sockers | 0.6 MW | |
| RE Dillard 4 LLC | 0.4 MW |
Page 22 of 22
← Previous
Operating capacity by state
Click a state to drill down; click it again to go back to the whole country.
Largest owners and operators
By capacity in the current view. Click to see their plants.
- IPX Power USA, LLC9 plants · 2,484 MW
- Terra-Gen Operating Co-Hybrid11 plants · 1,325 MW
- Southern Power Co13 plants · 1,291 MW
- MN8 Energy LLC65 plants · 1,191 MW
- RWE Americas, LLC21 plants · 1,072 MW
- AES Distributed Energy75 plants · 1,044 MW
- AES Clean Energy6 plants · 751 MW
- Topaz Solar Farms LLC1 plants · 586 MW
- 50LW 8me LLC1 plants · 500 MW
- Grace Orchard Interconnection, LLC1 plants · 500 MW
- 26SB 8me LLC1 plants · 500 MW
- Pelicans Jaw Solar LLC1 plants · 440 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map