| Garnet Solar Generation Station I LLC |
4.0 MW |
Operating |
CA Riverside |
Garnet Solar Generation Station I LLC |
2014 |
| IOS II-LAX9 |
4.0 MW |
Operating |
CA San Bernardino |
Madison Energy Holdings LLC |
2020 |
| Ironwood Solar LLC |
4.0 MW |
Operating |
CA Riverside |
Altus Power America Management, LLC |
2012 |
| Lindsay Solar |
4.0 MW |
Operating |
CA Tulare |
Altus Power America Management, LLC |
2014 |
| Munro Valley Solar |
4.0 MW |
Operating |
CA Inyo |
Ecos Energy LLC |
2016 |
| North Kern State Prison Phase II |
4.0 MW |
Operating |
CA Kern |
SunE P11L Holdings, LLC |
2012 |
| North Palm Springs 4A |
4.0 MW |
Operating |
CA Riverside |
Altus Power America Management, LLC |
2012 |
| Redemeyer Road Solar |
4.0 MW |
Operating |
CA Mendocino |
RPCA Solar 10, LLC |
2026 |
| River Ranch Dairy |
4.0 MW |
Operating |
CA Kings |
Renewable Solar, Inc |
2024 |
| Rutan |
4.0 MW |
Operating |
CA Los Angeles |
CD US Solar MT 2 LLC |
2014 |
| UC Riverside Lots 30 & 32 |
4.0 MW |
Operating |
CA Riverside |
MN8 Energy LLC |
2017 |
| Amazon PSP1 |
3.8 MW |
Operating |
CA Riverside |
Greenbacker Renewable Energy Corporation |
2021 |
| AVS Lancaster 1 |
3.7 MW |
Operating |
CA Los Angeles |
Tesla Inc. |
2016 |
| California State Univ at Channel Islands |
3.7 MW |
Operating |
CA Ventura |
SkyHigh 2 Solar |
2021 |
| Kingsburg Solar |
3.7 MW |
Operating |
CA Tulare |
Altus Power America Management, LLC |
2013 |
| Stanford Campus Solar |
3.7 MW |
Operating |
CA Santa Clara |
MN8 Energy LLC |
2017 |
| Foothill Sanitary Landfill - Solar Array |
3.6 MW |
Operating |
CA San Joaquin |
Ameresco San Joaquin Solar LLC |
2021 |
| Sierra Pacific Chinese Camp |
3.6 MW |
Operating |
CA Tuolumne |
Sierra Pacific Industries |
2022 |
| Amazon Visalia (FAT2) |
3.5 MW |
Operating |
CA Tulare |
Madison Energy Investments LLC |
2023 |
| Butte College Main Campus Solar |
3.5 MW |
Operating |
CA Butte |
Butte-Glenn Community College District |
2011 |
| CFF Rice Mill Solar Plant |
3.5 MW |
Operating |
CA Colusa |
California Family Foods |
2025 |
| Crystal Farms Local Solar |
3.5 MW |
Operating |
CA Fresno |
Agilitas Energy, Inc. |
2023 |
| Exeter Solar |
3.5 MW |
Operating |
CA Tulare |
Altus Power America Management, LLC |
2014 |
| Ivanhoe Solar |
3.5 MW |
Operating |
CA Tulare |
Altus Power America Management, LLC |
2014 |
| Porterville Solar |
3.5 MW |
Operating |
CA Tulare |
Altus Power America Management, LLC |
2014 |
| Sacramento Regional County Sanitation PV |
3.5 MW |
Operating |
CA Sacramento |
Tesla Inc. |
2017 |
| Wonderful Kings |
3.5 MW |
Operating |
CA Kern |
Wonderful Renewable Energy, LLC. |
2022 |
| City of Tulare Water Facility |
3.4 MW |
Operating |
CA Tulare |
City of Tulare Water Pollution Control - (CA) |
2011 |
| EMWD - Perris Valley RWRF |
3.4 MW |
Operating |
CA Riverside |
SkyHigh 2 Solar |
2021 |
| SunAnza |
3.4 MW |
Operating |
CA Riverside |
Arizona Electric Pwr Coop Inc |
2017 |
| CA-DGS RFP-Salinas Valley State Prison |
3.3 MW |
Operating |
CA Monterey |
Forefront Power, LLC |
2023 |
| Pacifico Power Palmdale 01 |
3.3 MW |
Operating |
CA Los Angeles |
Pacifico Power Palmdale 01 LLC |
2026 |
| Whitethorn Solar LLC |
3.3 MW |
Operating |
CA Alameda |
Whitethorn Solar LLC |
2016 |
| 8500 Balboa PV, LLC |
3.2 MW |
Operating |
CA Los Angeles |
8500 Balboa PV, LLC |
2022 |
| CA OXNARD 2600 Sakioka Dr |
3.2 MW |
Operating |
CA Ventura |
Catalyze Oxnard 2600 Sakioka Drive Microgrid, LLC |
2025 |
| Avalon Dairy |
3.1 MW |
Operating |
CA Kern |
Renewable Solar, Inc |
2024 |
| Corcoran Irrigation District Floating So |
3.1 MW |
Operating |
CA Kings |
Solar Powered Ag, LLC |
2025 |
| Malech Solar Farm |
3.1 MW |
Operating |
CA Santa Clara |
County of Santa Clara - (CA) |
2017 |
| Orange Coast College PH2 Solar Project |
3.1 MW |
Operating |
CA Orange |
Solar Star Coastal Pirate, LLC |
2022 |
| Aerojet I |
3.0 MW |
Operating |
CA Sacramento |
Altus Power America Management, LLC |
2009 |
| American Canyon Solar |
3.0 MW |
Operating |
CA Napa |
RP Napa Solar 1, LLC |
2019 |
| Broadway 2 - UC Riverside |
3.0 MW |
Operating |
CA Riverside |
MN8 Energy LLC |
2014 |
| CA - Fresno, City of - SE Surface WTP |
3.0 MW |
Operating |
CA Fresno |
Forefront Power, LLC |
2025 |
| CalCity Solar 1 |
3.0 MW |
Operating |
CA Kern |
CalCity Solar 1, LLC |
2019 |
| Central Antelope Dry Ranch B LLC |
3.0 MW |
Operating |
CA Los Angeles |
Central Antelope Dry Ranch B, LLC |
2017 |
| Community Solar Utica 1, LLC |
3.0 MW |
Operating |
CA Kings |
AETS OpCo Holdings LLC |
2025 |
| Depot Park Solar System |
3.0 MW |
Operating |
CA Sacramento |
Depot Park Solar Farm |
2010 |
| Dissigno Healdsburg FPV, LLC |
3.0 MW |
Operating |
CA Sonoma |
Palmetto Power Management LLC |
2020 |
| Dos Palos Clean Power |
3.0 MW |
Operating |
CA Merced |
Dos Palos Clean Power LLC |
2025 |
| Eagle Creek |
3.0 MW |
Operating |
CA Kern |
ZGlobal Inc |
2019 |