πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Power plants β€Ί Solar farms

OCTARY USA Β· SOLAR FARMS

SkyHigh 2 Solar: solar farms in the USA

Every utility-scale solar farm in the United States of 1 MW or more: operating, under construction, planned, retired and cancelled. Click a state to drill down, or search near a place.

Operating15plants
Operating capacity40.4 MWnameplate
Under construction0.0 MW0 plants
Whole pipeline0.0 MWplanned, approved and building

Map

Loading plants…
OperatingUnder constructionApprovedPlannedRetiredCancelled

Plants

15 plants
PlantCapacityStageStateOwner / operatorYear
Niagara Bottling - Seguin 4.9 MW Operating TX
Guadalupe
SkyHigh 2 Solar 2021
EMWD - San Jacinto RES BCT 4.2 MW Operating CA
Riverside
SkyHigh 2 Solar 2022
Niagara Bottling - Rialto 4.2 MW Operating CA
San Bernardino
SkyHigh 2 Solar 2021
California State Univ at Channel Islands 3.7 MW Operating CA
Ventura
SkyHigh 2 Solar 2021
EMWD - Perris Valley RWRF 3.4 MW Operating CA
Riverside
SkyHigh 2 Solar 2021
BYU - Hawaii 3.1 MW Operating HI
Honolulu
SkyHigh 2 Solar 2021
TES Rowtier 3.0 MW Operating MA
Worcester
SkyHigh 2 Solar 2021
Amazon TUS2 2.6 MW Operating AZ
Pima
SkyHigh 2 Solar 2022
EMWD - Moreno Valley RWRF 2.4 MW Operating CA
Riverside
SkyHigh 2 Solar 2021
CSU San Jose State University 1.7 MW Operating CA
Santa Clara
SkyHigh 2 Solar 2021
EMWD - Sun City RWRF 1.6 MW Operating CA
Riverside
SkyHigh 2 Solar 2021
Firestone Walker Brewery - Phase 1 1.6 MW Operating CA
San Luis Obispo
SkyHigh 2 Solar 2020
El Dorado County 1.5 MW Operating CA
El Dorado
SkyHigh 2 Solar 2021
EMWD - San Jacinto RWRF NEM 1.3 MW Operating CA
Riverside
SkyHigh 2 Solar 2021
TruStile Doors - Denver 1.2 MW Operating CO
Adams
SkyHigh 2 Solar 2021

Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map