United States βΊ Power plants βΊ Solar farms
OCTARY USA Β· SOLAR FARMSOrigis Energy USA, Inc: solar farms in the USA
Every utility-scale solar farm in the United States of 1 MW or more: operating, under construction, planned, retired and cancelled. Click a state to drill down, or search near a place.
Operating17plants
Operating capacity2,044 MWnameplate
Under construction64.9 MW1 plants
Whole pipeline286 MWplanned, approved and building
Map
Loading plantsβ¦
OperatingUnder constructionApprovedPlannedRetiredCancelled
Plants
20 plants
| Plant | Capacity | Stage |
|---|---|---|
| Rockhound A | 245 MW | |
| Escalante (NM) | 200 MW | |
| Golden Triangle | 200 MW | |
| Optimist | 200 MW | |
| Swift Air Solar II | 174 MW | |
| Golden Triangle II | 150 MW | |
| Wheatland | 150 MW | |
| Swift Air Solar I | 145 MW | |
| Sand Luis West | 125 MW | Consented |
| Swift Air Solar III | 100 MW | |
| Covington (MS) | 96.0 MW | Consented |
| Walker Springs I | 80.0 MW | |
| Walker Springs II | 80.0 MW | |
| Wing | 80.0 MW | |
| Whistling Duck I | 75.0 MW | |
| Rice Creek | 74.9 MW | |
| Chalan | 64.9 MW | Under construction |
| Rockhound C | 61.0 MW | |
| Rockhound D | 28.0 MW | |
| MA Solar Storage 1 Hybrid | 1.1 MW |
Operating capacity by state
Click a state to drill down.
Largest owners and operators
By capacity in the current view. Click to see their plants.
- Florida Power & Light Co135 plants Β· 9,797 MW
- RWE Americas, LLC105 plants Β· 6,532 MW
- Cypress Creek Renewables190 plants Β· 5,672 MW
- Invenergy Services LLC36 plants Β· 5,407 MW
- Vesper Energy Development LLC18 plants Β· 4,219 MW
- Leeward Asset Management, LLC27 plants Β· 4,062 MW
- Lightsource Renewable Energy Asset Management, LLC39 plants Β· 3,828 MW
- AES Clean Energy62 plants Β· 3,795 MW
- IPX Power USA, LLC12 plants Β· 3,458 MW
- Repsol Renewables NA12 plants Β· 3,447 MW
- BrightNight Power5 plants Β· 3,257 MW
- Southern Power Co31 plants Β· 3,051 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map